- Campaigns
- About us
- Get Involved
-
News
Current News
Climate science: Countering the myths
A greener Wales - making it happen
Recycling in Monmouthshire
Wind power latest poll
GM Campaign Victory!
Scarecrows across Wales demand GM-free fields
Keep Wales GM free
Coal in Wales
The future of energy in Wales
Environmental campaigning - What can I do?
Assembly elections 2003
Scarweather Sands offshore windfarm
Green Question Time
Wind farm campaign success!
UK Government reopens nuclear debate
The climate is changing
Severn Barrage and tidal energy
Newport Big Ask Live gig
Pembrokeshire to London - Gerald's GM pilgrimage
Is trade fair?
Wind Power: 20 Myths Blown Away
Dai the Dragon demands action at global climate talks
Merthyr defeats massive rubbish incinerator
Assembly election green hustings around Wales
Manifesto for a greener Wales
Press releases
Giant Welsh incinerator proposal is key test of new planning law
New research shows potential for thousands of green jobs in the Heads of the Valleys
‘Warmest year on record’ call for action
300 new green jobs for Wales
Planning commission decision on Merthyr incinerator slammed
Welsh political parties should heed climate warning
New Uskmouth power station ‘yesterday’s technology’
Effective recycling doesn’t need multiple waste bins, says Friends of the Earth Cymru
Pembroke power station efficiency claim disputed
Europe acts over Pembroke power station
Response to Japanese nuclear emergency
New assembly powers could give people and the environment the right to a healthy future
Last chance to register opposition to massive rubbish incinerator in Wales
‘No new nuclear power in Wales’ call to Ieuan and Carwyn on Chernobyl anniversary
First chance for Merthyr residents to be heard by commissioners over massive incinerator
Campaigners urge AMs to hit severe fuel poverty for 6
Pembroke power station unlawful
Welsh Government halts new Pembroke power station
Wales at risk from nuclear power station in Somerset
New charge could cut carrier bag use by 90 per cent
Nuclear power consultation ignored Welsh language
Scrapping of Merthyr incinerator a victory for people and for common sense
Damaging Pembrokeshire power station set to go ahead
Massive failure on green energy in Wales
- Resources
Severn Barrage and tidal energy6 September 2007
Download Friends of the Earth Cymru's Severn Barrage report (PDF†)
There are cheaper and less environmentally damaging ways to generate power from the Severn Estuary than a tidal barrage
The tidal range in the Severn Estuary is one of the highest in the world, reaching over 13 metres, and ideas for taking advantage of energy generation have long been suggested.
The proposed Severn Barrage project would stretch nearly 10 miles from Lavernock Point west of Cardiff to near Brean Down in Somerset. It would cost around £14 billion.
Construction of the 60 million tonne structure, including 370 reinforced concrete caissons totalling 17 million tonnes, would take until 2019 at the earliest. It would enclose around 185 square miles of the estuary.
Why would the Barrage be environmentally damaging?
- The Barrage wall would create a 5 metre deep lake to its eastward side, losing an inter-tidal habitat, feeding grounds for tens of thousands of birds
- The Barrage would halve the tidal range and sensitive flora and fauna would be lost, and the famous Severn Bore diminished
- The Barrage could also have a significant impact on fish species of conservation interest, through use of fish sluices within the barrage wall
- The Barrage could significantly damage the viability of ports. It would also generate new traffic on existing road networks around Lavernock and Cardiff airport and cause development pressures in rural Somerset
- The government's own statutory advisers state that 'a Severn Barrage project would not be possible within the current legal framework provided by the EU Habitats and Birds Directives. The estuary is also being proposed for designation as a Special Area of Conservation (SAC), the highest protection in European Union law
Why the Severn Barrage will not address our needs
- The Barrage project cannot be justified on coastal protection grounds as coastal flood defence schemes can be built relatively quickly and sea level rises are forecast to take decades to a century or more to rise to a point at which they would be needed
- Alternative investments would reduce carbon more quickly in the next few critical decades
- The Barrage's huge twice-daily three hour pulses of power would not synchronise with the daily variations in grid demand, resulting in costly stand-by capacity
- The Barrage itself could cause coastal erosion or flood risk on its seaward side
Alternative low-carbon solutions
- Tidal lagoons: electricity generating lagoons located about a mile off the Severn coast
- Shoots barrier or barrage: A shorter flood defence barrier or a barrage near the Second Severn Crossing
- Other marine technologies: eg marine current turbines in the Bristol Channel
- Wind energy: about 1,000 offshore 5 MW wind turbines would generate the same annual output as the Barrage project
- Carbon Capture and Storage (CCS): CCS fitted to coal or gas power stations would reduce their emissions by 85-90%
Friends of the Earth Cymru believes there are environmentally benign ways to generate tidal energy from the Severn Estuary. To destroy a unique, internationally important and protected conservation area to generate just one percent of UK energy is not the way forward.
Download Friends of the Earth Cymru's Severn Barrage report (PDF†)




Discuss "Severn Barrage and tidal energy" in our forum